1.1 This specification covers cold-weather admixture systems to be added to hydraulic-cement concrete when the temperature of the concrete immediately after placement will be as low as -5.0 °C [23.0 °F] prior to the time of initial set.
Product Details
- Published:
- 10/01/2016
- Number of Pages:
- 8
- File Size:
- 1 file , 130 KB