Click here to purchase
This userguide contains a description of the Unit Production Cost Tracking Model for use in design tradeoffs and control and reporting tasks of a Design-to-Cost program. This model is designed to compare two Cost Breakdown Structures (CBS) to show elemental and summary cost differences. The two Cost Breakdown Structures may represent design alternatives, or a target allocation and the current design approach for comparison.
Product Details
- Published:
- 05/31/2016
- File Size:
- 1 file , 2.8 MB