09/11/202008/11/20194648 (RP-1132) — Leakage of Ducted Air Terminal Connections: Part 1, Experimental Procedure and Data Reduction
09/11/202008/11/2019CH-99-03-2 (RP-751) — Effects of Oil on Boiling R-123 and R-134a Flowing Normal to an Integral-Finned Tube Bundle