09/11/202008/11/2019CH-09-032 (RP-1292) — Experimental Verification of a Three Zone VAV System Model Operating with Fan Powered Terminal Units
09/11/202008/11/2019SF-98-27-4 (RP-622) — Determination of Coil Defrosting Loads: Part I-Experimental Facility Description (same as 4120)