This paper describes a builder’s guide to reducing mold risk. The guide was developed as a part of a 30-month program sponsored by the California Energy Commission’s Public Interest Energy Research program and the Gas Research Institute to conduct a detailed investigation of residential building construction practices and innovative building assemblies that are resistant to mold formation and growth. The guide emphasizes a three-part strategy to reduce mold risk. The strategy is based on the history of mold problems in California buildings. The three-part strategy is applied to the development, design, installation, and ownership phases of residential construction. The discussion includes recommendations, supporting data, and references to other guideline information pertinent to mold-resistant construction.
Units: Dual
Citation: ASHRAE Transactions, Vol. 113, pt 1, Dallas 2007
Product Details
- Published:
- 2007
- Number of Pages:
- 13
- File Size:
- 1 file , 1.2 MB
- Product Code(s):
- D-DA-07-034