This article explains the next-to-last step in the technical commissioning process: measurement and verification (M&V). Practically speaking, M&V involves using industry-standard tools and processes to check and ensure that the now-occupied facilities (whether a single building or a group of structures) perform at the owner’s expected level of resource efficiency—and what steps you can take if the desired performance level has not been achieved.
Citation: ASHRAE Journal, vol. 56, no. 8, Aug 2014
Product Details
- Published:
- 2014
- Number of Pages:
- 6
- File Size:
- 1 file , 180 KB
- Product Code(s):
- D-AJ14Aug03