Click here to purchase

This product is a PDF that contains links to files that consist of PowerPoint slides synchronized with the audio-recording of the speaker (recorded presentation), PDF files of the slides, and audio only (mp3) as noted.

Integrated project delivery (IPD) is a proven approach for efficiently designing and building a facility for owners and an effective method for architects, engineers and contractors to garner the highest quality for the best value and schedule. To date, IPD has mostly been applied to private-sector projects rather than public-sector ones, which are often hampered by lowest cost-bid contracting rules and an inability to adopt integrated contracts where the risks and rewards are shared among the all primary project stakeholders. This seminar reveals the prescription for success behind the $1.6 billion UCSF Medical Center project which resulted in a highly collaborative, integrated, BIM centric project that maintained scope, quality and performance for this facility.

Integrated Project Delivery for a Major University Medical Center
Raj Daswani, P.E., Member, Tad Smith, Paul Switenki, P.E., Member
Product contains: recorded presentation, slides (PDF format), audio (mp3 format)

Citation: ASHRAE Seminar Recording, 2011 Annual Conference, Montreal

Product Details

Published:
2011
File Size:
1 file , 300 KB
Product Code(s):
D-ML11Sem31