The scope of integrated building design addresses the design integration of buildings and facilities among all disciplines from project conception to final completion and handover. This paper discusses the design and construction integration of cleanroom buildings and cleanroom facilities to achieve better quality, faster delivery, lower cost, more optimized operation and maintenance, lower energy consumption, cleaner environment, safer, more reliable and more productive conditions, and longer service life.
Units: Dual
Citation: ASHRAE Transactions, vol. 111, pt. 1, Orlando 2005
Product Details
- Published:
- 2005
- Number of Pages:
- 8
- File Size:
- 1 file , 3.9 MB
- Product Code(s):
- D-25691