1.1 This guide outlines procedures for setup of a nuclear gauge calibration facility in either a shielded bay or an unshielded area-Guide A and Guide B, respectively.
Product Details
- Published:
- 02/15/2023
- Number of Pages:
- 6
- File Size:
- 1 file , 340 KB
- Redline File Size:
- 2 files , 490 KB
- Note:
- This product is unavailable in Russia, Ukraine, Belarus