Heat recovery is prioritized on all wasted heat in both the office and condo towers of Montreal’s 35-story Altoria/AIMIA skyscraper. Office spaces are mainly heated and cooled by hybrid heat pumps (HHP) connected to a partial geothermal loop of 15 wells. The office tower’s EUI in its first year was 60.3 kBtu/ft2 (684.8 MJ/m2).
Citation: ASHRAE Journal, vol. 58, no. 4, April 2016
Product Details
- Published:
- 2016
- Number of Pages:
- 9
- Units of Measure:
- Dual
- File Size:
- 1 file , 520 KB
- Product Code(s):
- D-AJ16Apr05