Click here to purchase

1.1 This practice establishes procedures for the hosedown of a membrane switch to verify adequate protection from ingress of water from a high-volume water spray.

1.2 This practice can also be used to verify the ability of a membrane switch or graphics layer to act as a liquid seal for a finished product.

1.3 Additional test methods or practices can be incorporated to investigate specific results or capabilities.

1.4 This practice is a modification of NEMA Publication Number 250-1991 Section 6.7 which is a test for hosedown of a finished product housing.

Product Details

Published:
06/10/2001
Number of Pages:
2
File Size:
1 file , 49 KB