When the HVAC design of the Hamilton Landing project was first conceived in 1998, it consisted of large package air-cooled rooftop units sitting next to the historic hangars with a conventional overhead VAV reheat system.
Citation: ASHRAE Journal, Vol. 47, No. 7
Product Details
- Published:
- 2005
- Number of Pages:
- 3
- File Size:
- 1 file , 360 KB
- Product Code(s):
- D-25927