Click here to purchase

Environmental issues were seriously addressed when a new building was designed with district heating and cooling for the Osaka gas company. As a result, the building was officially recognized as “Environmentally Conscious Building No. 1” by the Construction Ministry. In order to reduce cost by peak shaving, adoption of a floor thermal storage system was planned. This paper describes results regarding the peak shaving by floor thermal storage system in designing the air-conditioning system.

Units: Dual

Citation: ASHRAE Transactions, vol. 106, pt. 1

Product Details

Published:
2000
Number of Pages:
6
File Size:
1 file , 120 KB
Product Code(s):
D-7321