Click here to purchase

The scope of integrated building design addresses the design integration of buildings and facilities among all disciplines from project conception to final completion and handover. This paper discusses the design and construction integration of cleanroom buildings and cleanroom facilities to achieve better quality, faster delivery, lower cost, more optimized operation and maintenance, lower energy consumption, cleaner environment, safer, more reliable and more productive conditions, and longer service life.

Units: Dual

Citation: ASHRAE Transactions, vol. 111, pt. 1, Orlando 2005

Product Details

Published:
2005
Number of Pages:
8
File Size:
1 file , 3.9 MB
Product Code(s):
D-25691