1.1 It is the intent of this guide to set forth criteria and procedures for the design, fabrication and installation of nuclear fuel dissolution facilities. This guide applies to and encompasses all processing steps or operations beyond the fuel shearing operation (not covered), up to and including the dissolving accountability vessel.
Product Details
- Published:
- 04/01/2023
- Number of Pages:
- 17
- File Size:
- 1 file , 330 KB
- Redline File Size:
- 2 files , 470 KB
- Note:
- This product is unavailable in Russia, Ukraine, Belarus