1.1 This guide provides guidance and recommended practices for establishing a comprehensive quality assurance program for uranium conversion facilities.
This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate health and safety practices and determine the applicability of regulatory limitations prior to use.
1.2 The basic elements of a quality assurance program appear in the following order:
FUNCTION | SECTION |
Organization | |
Quality Assurance Program | |
Design Control | |
Instructions, Procedures Drawings | |
Document Control | |
Procurement | |
Identification and Traceability | |
Processes | |
Inspection | |
Control of Measuring and Test Equipment | |
Handling, Storage and Shipping | |
Inspection, Test and Operating Status | |
Control of Nonconforming Items | |
Corrective Actions | |
Quality Assurance Records | |
Audits |
Product Details
- Published:
- 06/01/2004
- Number of Pages:
- 8
- File Size:
- 1 file , 59 KB
- Redline File Size:
- 2 files , 100 KB