Click here to purchase

1.1”This guide discusses three steps in preparing spent nuclear fuel (SNF) for placement in a sealed dry storage system: (1) evaluating the needs for drying the SNF after removal from a water storage pool and prior to placement in dry storage, (2) drying the SNF, and (3) demonstrating that adequate dryness has been achieved.

1.1.1”The scope of SNF includes nuclear fuel of any design (fuel core, clad materials, and geometric configuration) discharged from power reactors and research reactors and its condition as impacted by reactor operation, handling, and water storage.

Product Details

Published:
10/01/2021
Number of Pages:
22
File Size:
1 file , 370 KB
Redline File Size:
2 files , 790 KB