Click here to purchase

1.1 This practice covers the determination of the length changes of cast, drilled, or sawed specimens of hydraulic-cement mortar and concrete due to causes other than externally applied forces and temperature changes. It can be readily adapted, if desired, to studies of length change involving different schedules or environmental treatment than the standard procedures prescribed by this practice.

1.2 The values stated in either inch-pound units or SI units shall be regarded separately as standard. The units stated in each system may not be exact equivalents; therefore, each system must be used independently of the other, without combining in any way. The inch-pound units are shown in brackets.

1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

Product Details

Published:
05/01/2005
Number of Pages:
4
File Size:
1 file , 110 KB