1.1”This test method defines procedures for testing vitrified clay pipe lines, using low-pressure air, to demonstrate the integrity of the installed line. Refer to Practice C12.
Product Details
- Published:
- 04/01/2021
- Number of Pages:
- 3
- File Size:
- 1 file , 69 KB