1.1 This test method covers procedures for taking a composite or a master composite sample, at the mine or at the factory or from a consignment, of a lot of milled asbestos fiber used as raw material in the chrysotile asbestos industry, conditioning this sample and reducing it in quantity through a series of steps to provide a relatively small test specimen of loose asbestos fibers, representative of the lot and suitable for the determination of a single property.
Product Details
- Published:
- 04/15/2019
- Number of Pages:
- 6
- File Size:
- 1 file , 240 KB