Click here to purchase

1.1 This practice is a guide for removing specimens for built-up bituminous roof systems during application, but before the application of flood coating and top surfacing, for determining the approximate quantities of the components and the possible presence of moisture, or dry spots between plies, in the field. Components may consist of:

1.1.1 Insulation, when part of the roof membrane system,

Product Details

Published:
11/01/2016
Number of Pages:
4
File Size:
1 file , 94 KB
Redline File Size:
2 files , 190 KB