Click here to purchase

1.1 This practice describes a procedure for conducting a specific capacity test, computing the specific capacity of a control well, and estimating the transmissivity in the vicinity of the control well. Specific capacity is the well yield per unit drawdown at an identified time after pumping started.

Product Details

Published:
06/01/2020
Number of Pages:
6
File Size:
1 file , 95 KB
Redline File Size:
2 files , 220 KB