1.1 This test method covers the guidelines, requirements, and procedures for evaluating the ability of temporary ditch check systems to protect earthen channels from stormwater-induced erosion. Critical elements of this protection are the ability of the temporary ditch check to:
1.1.1 Slow or pond runoff, or both, to encourage sedimentation, thereby reducing soil particle transport downstream;
Product Details
- Published:
- 01/01/2014
- Number of Pages:
- 8
- File Size:
- 1 file , 400 KB
- Redline File Size:
- 2 files , 1.2 MB