Click here to purchase

1.1 This specification covers flexible, preformed sheet membrane materials to be used as vapor retarders in contact with soil or granular fill under concrete slabs.

1.1.1 A task group in Subcommittee E06.21 is working on a specification for bituminous vapor retarders.

1.2 The specified tests are conducted on new materials and materials that have been conditioned or exposed to simulate potential service conditions.

Product Details

Published:
03/10/1997
Number of Pages:
3
File Size:
1 file , 26 KB