Click here to purchase

1.1 This guide provides an approach for developing a basis for obtaining approval for release of bulk materials to be removed from a decontamination and decommissioning (D&D) or environmental remediation site from regulatory control. This would be addressed in the decommissioning plan (Guide E1281). Fig. 1 follows the logic described in the MARSAME for determining the materials that could be considered for release. Materials that negotiate this logic tree are referred to as “candidate for release based on dose.”

Product Details

Published:
07/01/2016
Number of Pages:
8
File Size:
1 file , 170 KB
Redline File Size:
2 files , 380 KB