1.1 This test method is intended to apply to building materials used in construction below the base flood elevation (BFE) including, but not limited to: individual building materials and composite assemblies of building materials that constitute permanent integral parts of a finished building including walls, floors, ceilings, stairways, built-in partitions, finishes, cladding, and other similarly incorporated architectural and structural items.
Product Details
- Published:
- 11/01/2018
- Number of Pages:
- 6
- File Size:
- 1 file , 89 KB
- Redline File Size:
- 2 files , 170 KB