1.1 This practice covers an inspection procedure to ensure that studs installed with an anaerobic thread locking compound have achieved the necessary backout resistance.
Product Details
- Published:
- 03/01/2014
- Number of Pages:
- 2
- File Size:
- 1 file , 52 KB