1.1 This practice establishes procedures for the hosedown of a membrane switch to verify adequate protection from ingress of water from a high-volume water spray.
1.2 This practice can also be used to verify the ability of a membrane switch or graphics layer to act as a liquid seal for a finished product.
1.3 Additional test methods or practices can be incorporated to investigate specific results or capabilities.
1.4 This practice is a modification of NEMA Publication Number 250-1991 Section 6.7 which is a test for hosedown of a finished product housing.
Product Details
- Published:
- 02/01/2007
- Number of Pages:
- 2
- File Size:
- 1 file , 49 KB
- Redline File Size:
- 2 files , 97 KB