Click here to purchase

The cooling tower is often the forgotten component of the water cooling system when it comes to maintenance. It’s a good example of the phrase “out of sight, out of mind.” A newly installed cooling tower reliably delivers the design fluid temperature and flow rate. However, since its heat transfer operation creates a hurricane-like environment and is a natural air-washer, the cooling tower needs routine inspection and maintenance to continue performing as designed. This article discusses routine maintenance and suggests ways to improve cooling tower performance.

Citation: ASHRAE Journal, Vol. 47, No. 3

Product Details

Published:
2005
Number of Pages:
6
File Size:
1 file , 190 KB
Product Code(s):
D-24254