Click here to purchase
The paper describes the experiences with passive houses that have been built and operated in Vienna during the last years.
The first part of the paper is the description of the projects; the second part presents measurement results during the first years
of operation regarding indoor climate and energy consumption. The third and main part describes the lessons learnt regarding
the necessary accuracy of calculations in the design phase with special focus on solar shading, internal loads, thermal bridges,
and the distribution losses of hot water and the heating systems.

Citation: Thermal Performance, International Conference, 2010

Product Details

Published:
2010
File Size:
1 file , 2.5 MB
Product Code(s):
D-BUILDINGSXI-61