Click here to purchase

This paper presents an absorption system design process that relies on computer simulations that are validated by experimental findings. An ammonia-water absorption heat pump cycle at 3 refrigeration tons (RT) and chillers at 3.3 RT and 5 RT (10.5 kW, 11.6 kW, and 17.6 kW) were initially modeled and then built and tested. The experimental results were used to calibrate both the cycle simulation and the component simulations, yielding computer design routines that could accurately predict component and cycle performance. Each system was a generator-absorber heat exchange (GAX) cycle, and all were sized for residential and light commercial use, where very little absorption equipment is currently used. The specific findings of the 5 RT (17.6 kW) chiller are presented. Modeling incorporated a heat loss from the gas-fired generator and pressure drops in both the evaporator and absorber.Simulation resultsand experimental findings agreed closely and validated the modeling method and simulation software.

Units: Dual

Citation: Symposium, ASHRAE Transactions, vol. 105, pt. 1

Product Details

Published:
1999
Number of Pages:
11
File Size:
1 file , 340 KB
Product Code(s):
D-7589