Click here to purchase
Achievinghigh levels of indoor environmental quality can involve using dedicated outdoorair systems (DOAS), which are designed to handle cooling and heating loadsassociated with treating a large percentage of outdoor air. However, auniversal challenge is verifying that these units are continuously workingefficiently and implementing the intended control strategy. This articledescribes a “connected commissioning” process that can help solve this problem.
Citation: ASHRAE Journal, Vol. 62, no. 2, February 2020
Product Details
- Published:
- 2020
- Number of Pages:
- 8
- Units of Measure:
- Dual
- File Size:
- 1 file , 240 KB
- Product Code(s):
- D-AJ20Feb02