Data center planning and design is highly dependent on initial and lifetime load profiles. Typically, three to five IT hardware lifetimes exist within the single lifetime of the building power and cooling systems. Now, consider that each hardware lifetime can have one or more software lifetime and these profiles have a disproportionately high impact on lifetime capital and operating expenses. The author examines the variables of a typical server rack and provides some insight as to why the TC 9.9 Power Trends Chart values can be misinterpreted if their application is not clearly understood.
Citation: ASHRAE Journal, vol. 56, no. 4, April 2014
Product Details
- Published:
- 2014
- Number of Pages:
- 5
- File Size:
- 1 file , 450 KB
- Product Code(s):
- D-AJ14AprDC