Click here to purchase

Stone 34, a 130,000 ft² (12,077 m²) mixed-use commercial office building, exceeded the aggressive performance standards of Seattle’s Deep Green Pilot.The requirements of this program include achieving at least 60% of the “Living Building Challenge” imperatives, a 75% reduction in total annualenergy usage compared to 2003 CBECS data, a 75% reduction in potable water usage, and re-use of at least 50% of storm water that falls on the site.The Deep Green Pilot requires validated performance after 12 continuous months of operation, and both the design team and ownership team facedfinancial penalties if the building failed to meet the program targets. This paper will explain the “bookend approach” that the design and ownership teamused to ensure that the occupied building met the performance requirements.

Citation: 2017 Winter Conference, Las Vegas, NV, Conference Papers

Product Details

Published:
2017
Number of Pages:
8
Units of Measure:
Dual
File Size:
1 file , 1.8 MB
Product Code(s):
D-LV-17-C035