Click here to purchase

Monitoring equipment was installed on a residential air conditioning unit to test the effects of a pre-programmed thermostat timer. This was done to determine its effect on the utility’s load shape for the purpose of avoiding peak generation capacity. This report measured the temperature and energy changes as a result of the test.

Units: Dual

Citation: Symposium, ASHRAE Transactions, 1987, vol. 93, pt. 1, New York, NY

Product Details

Published:
1987
Number of Pages:
10
File Size:
1 file , 650 KB
Product Code(s):
D-NY-87-19-5