Click here to purchase
ASHRAE Guideline 1.2 provides criteria for commissioning HVAC systems in existing buildings. This paper describes the facilities examined, commissioning measures implemented, and measured savings from commissioning existing buildings at two campuses of a community college in Texas. It will serve as an example for potential energy efficiency measures to be implemented and the impact of those measures. Measured savings are determined at the whole-facility level by analyzing utility bills before and after implementation of the measures.Measured savings from the project are $1,048,414 for a 456 dayperiod at one campus. This represents 33.1% savings for electrical use, and 28.7% for electrical demand. Measured savings were $84,213 for 272 days at the second campus representing 14.1% savings for electrical use, 1% savings for electrical demand, and 45.0% savings for natural gas.

Citation: 2020 Winter Conference, Orlando, FL Technical Papers

Product Details

Published:
2020
Number of Pages:
12
Units of Measure:
Dual
File Size:
1 file , 350 KB
Product Code(s):
D-OR-20-026