Click here to purchase

This document describes:

  1. the preparatory steps to test experimental Type II, III, and IV fluids according to AMS1428;

  2. the recommendations for the preparation of samples for endurance time testing according to ARP5485;

  3. a short description of wind tunnel testing;

  4. a short description of the recommended field spray test;

  5. the protocol to generate draft holdover time guidelines from endurance time data obtained from ARP5485;

  6. the protocol for inclusion of Type II, III, and IV fluids on the FAA and Transport Canada lists of fluids and the protocol for updating the lists of fluids;

  7. the role of the SAE G-12 Aircraft Deicing Fluids Committee;

  8. the role of the SAE G-12 Holdover Time Committee; and

  9. the process for the publication of Type II, III, and IV holdover time guidelines.

This document does not describe laboratory testing procedures.

This document does not include the qualification requirements for AMS1424 Type I fluids (these are provided in ARP6207).

Product Details

Published:
12/07/2017
Number of Pages:
18
File Size:
1 file , 490 KB
Redline File Size:
2 files , 3 MB