A new ground source heat pump routine has been incorporated in the DOE-2 building simulation program, but field validation of this routine is limited. Measured data are available for the operation of a ground source heat pump system for Maxey School, located in Lincoln, NE. Temperatures of the propylene glycol solution flowing into and out of the heat pump system vertical well field as predicted by the DOE-2 routine were compared with the measured data. The results showed a need for improvement in the routine, and a number of improvements were made. These changes helped, but some of the input parameters still had to be adjusted to obtain a reasonably good fit to the measured data. Future areas of investigation were suggested and a course of action was recommended.
Units: Dual
Citation: Symposium, ASHRAE Transactions, vol. 105, pt. 2, Seattle 1999
Product Details
- Published:
- 1999
- Number of Pages:
- 12
- File Size:
- 1 file , 270 KB
- Product Code(s):
- D-7486