Click here to purchase
This product is a zip file that contains files that consist of PowerPoint slides synchronized with the audio-recording of the speaker, PDF files of the slides, and audio only (mp3 format) as noted.The Marine Base at Albany, GA has been moving toward the aspect of Net Zero operations in steps of varied methods and this seminar is a recap of some of those elements. Step 1 is the addition of Sustainable Power by installation of a 31 MW PV Facility in cooperation with Georgia Power. Step 2 is the application of BTES system and application of Ground Source Heat Pump technology to improve energy efficiency in replacement of HVAC at the Base. Step 3 is the use of Retro Commissioning to review existing facility operations and make modifications for minimizing energy consumption.1. Step One: Addition of 31 MW PhotoVoltaic Facility at MCLB AlbanyWilliam Houser, P.E., Georgia Power, Atlanta, GA2. Step Two: Installation of BTES system at MCLB AlbanyChuck Hammock, P.E., Associate Member, Andrews, Hammock & Powel, Inc., Macon, GA3. Step Three: Maximizing by Retro-CommissioningRobert Bucey, P.E., Member, Jacobs, Dallas, TX8:00 AM – 9:00 AM

Citation: ASHRAE Seminar Recordings, 2019 Annual Conference, Atlanta, GA

Product Details

Units of Measure:
Dual
File Size:
1 file , 70 MB
Product Code(s):
D-AT19Sem02