Click here to purchase

This product is a PDF that contains links to files that consist of PowerPoint slides synchronized with the audio-recording of the speaker (recorded presentation), PDF files of the slides, and audio only (mp3) as noted.

Mission critical facilities require a unique holistic approach to design, controls and commissioning to ensure maximum system reliability. Going beyond the traditional approach and establishing a more unified automation project team provides the best opportunity to meet the client owner’s project requirements (OPR) while minimizing total cost of ownership (TCO). Integration of these critical project team members throughout all project phases from planning through operations is critical to optimizing a facility that is reliable and easy to own and operate. Best practices at various stages are explored including ways to setup projects for success. Case studies are presented providing lessons learned that have helped develop and improve this non-traditional approach.

35-1 Integrating Design, Commissioning, and BMS Controls to Deliver Mission Critical Success
Justin Seter, DLB Associates; Sean Graham, P.E., DLB Associates
This product contains: Recorded Presentation, Audio (mp3), Slides (pdf)

Product Details

Published:
2012
File Size:
1 file , 180 KB
Product Code(s):
D-SA12Sem35
Note:
This product is unavailable in Russia, Belarus