This product is a zip file that contains files that consist of PowerPoint slides synchronized with the audio-recording of the speaker, PDF files of the slides, and audio only (mp3 format) as noted.
Cleanrooms are expensive to build and operate over their expected useful life. They are expected to be adaptable and reconfigurable. Commissioning and performance verification are the heart of “proof” proper space environmental conditions, whether for the chip inside a smart phone or pacemaker or sterility of a COVID-19 vaccine. The commissioning process verifies a cleanroom’s performance and reliability. The objective of the commissioning process is to be in “Static balance and under dynamic control around the agreed design operating set points”.
- Designing a Cleanroom HVAC System< /br> Yusuf Bhetasiwala, Member, Encon Expertise Pvt. Ltd., Mumbai, India
- Overview of an Integrated Commissioning Process for Performance and Reliability< /br> Conor Murray, ASHRAE Ireland, Dublin, Ireland
- Best Practices and Common Mistakes in Cleanroom Projects with a Focus on Energy and Ease of Maintenance< /br> Kapil Mehrotra, ISHRAE, Mumbai, India
- Case Study on Managing Room Differential Pressure Control Using Venturi Valves< /br> Mike Amstadt, BCxP, Associate Member, Mead & Hunt, Middleton, WI
Product Details
- Published:
- 2023
- Units of Measure:
- Dual
- File Size:
- 1 file , 98 MB
- Product Code(s):
- D-TO22Sem50