Preparing equipment and assemblies for final check-out verification, start-up procedure and proper operation requires a coordinated activity of testing, adjusting, measurement and documentation that will ensure a successful result. This session describes how the commissioning process would be applied to achieve a successful chilled water plant operation needed to comply with the owner’s project requirement and the design documents.

  • Commissioning Chilled Water and Condenser Water Pumps
    David Cohen, P.E., Member, Grumman/Butkus Associates, Evanston, IL

Run Time: 90 mins.

Citation: ASHRAE Seminar Recordings, 2017 ASHRAE Winter Conference, Las Vegas, NV