This product contains links to files that consist of PowerPoint slides synchronized with the audio-recording of the speaker (recorded presentation), PDF files of the slides, and audio only (mp3) as noted.
Preparing equipment and assemblies for final check-out verification, start-up procedure and proper operation requires a coordinated activity of testing, adjusting, measurement and documentation that will ensure a successful result. This session describes how the commissioning process would be applied to achieve a successful chilled water plant operation needed to comply with the owner’s project requirement and the design documents.
- Commissioning Chilled Water and Condenser Water Pumps
David Cohen, P.E., Member, Grumman/Butkus Associates, Evanston, IL
Run Time: 90 mins.
Citation: ASHRAE Seminar Recordings, 2017 ASHRAE Winter Conference, Las Vegas, NV