Click here to purchase

This product is a PDF that contains links to files that consist of PowerPoint slides synchronized with the audio-recording of the speaker (recorded presentation), PDF files of the slides, and audio only (mp3) as noted.

The University of Michigan Health System just opened a new 1.1 million square foot children’s and women’s hospital. The University utilized extensive commissioning from the design phase through completion. This session demonstrates how the commissioning authority played a very large role in preparing for the final inspections and achieving the certificate of occupancy.

Opening a New Hospital: A Case Study
Matthew Tunnard, Member
Product Contains: Slides (pdf), Recorded Presentation, Audio (mp3)

Citation: ASHRAE Seminar Recordings, 2013 Winter Conference, Dallas, TX.

Product Details

Published:
2013
File Size:
1 file , 180 KB
Product Code(s):
D-DA13Sem64