For a building owner concerned with operating costs, the clear- est way to document that the M&E consultant, mechanical contractor and testing, adjusting, balancing (TAB) contractor haveachieved the design energy consumption is to compare the energyconsumption given in the TAB equipment report with that specifi edin approved shop drawings.
Citation: ASHRAE Journal, vol. 48, no. 2, pp. 36-46
Product Details
- Published:
- 2006
- Number of Pages:
- 11
- File Size:
- 1 file , 1.3 MB
- Product Code(s):
- D-27343