Click here to purchase
As part of a $1.48 billion project, a vehicle assembly plant underwent a renovation. The new chilled water system for its Energy Center operates at an average system efficiency of 0.42 kW/ton (0.12 kW/kW). It achieves a 45% reduction in annual power consumption and operating costs over baseline conditions.

Product Details

Published:
2022
Number of Pages:
3
Units of Measure:
Dual
File Size:
1 file , 1.2 MB
Product Code(s):
D-AJ22AUGCP
Note:
This product is unavailable in Russia, Belarus