Click here to purchase

A dramatic rise in visitors posed environmental challenges to the frescoes on the Sistine Chapel’s walls and ceiling. A new HVAC system, operational in October 2014, now maintains stable conditions to avoid cyclic effects and gradient accelerating aging of the artifacts. This article describes the challenges and system requirements and details the modeling, analysis, and design process used to develop this unique system.

Product Details

Published:
2015
Number of Pages:
15
Units of Measure:
Dual
File Size:
1 file , 910 KB
Product Code(s):
D-AJ15June01
Note:
This product is unavailable in Russia, Belarus